Stop pricing jobs you were never going to win.
RFiQ reads the whole bid package — spec book and drawings — pulls the scope that belongs to your division, checks the GC and the developer against your own win history, and hands back a verdict you can argue with.
Forty seconds, start to verdict. No edits, no speed-up on the parts that are slow.
A medical-office package the way a GC sends it — the project manual and the E-series drawings, nothing renamed. Every line it finds carries the page or sheet it came from.
Estimating capacity is the bottleneck. Not opportunity.
A tool that reads every division reads none of them well.
Scope hides in a different place for every trade. Electrical lives in the E-series; painting lives in a room finish schedule nobody cross-checks against the spec. So RFiQ ships one division at a time, and each one knows where to look.
Package in. Verdict out. Reasoning attached.
Nothing is a black box. Every number opens.
Your bid history is the asset. We treat it that way.
Ask before you bid.
We’re taking on a small number of subcontractors as design partners. You bring real packages and real bid history; we bring the verdict engine and move fast on what you tell us is wrong.